HomeMinesQLDDaandine
LEVEL 39, 111 EAGLE ST BRISBANE QLD , 4000
P: ( 07 ) 3012 4000 F: ( 07 ) 3012 4001
www.arrowenergy.com.au

DAANDINE

  • Information
  • Jobs
  • Owner
  • Map
  • Major Contractor
  • What is mined
About:

The Queensland located Arrow Energy's Daandine power station's first electricity production occurred in December 2006 as a result of coal seam methane gas obtained from the nearby Daandine gas field. Prior to the opening of the new power station, ramp up gas from the Daandine field, had been sold to CS Energy.


Daandine Power Station Generates Power From Daandine Gas
The first electricity generated by the new 27.4 megawatt Arrow Energy power station at Dalby was sold into the New South wales power grid. The occasion was a milestone event in Arrow Energy becoming a bone fide supplier of electricity from its wholly owned Daandine gas field.


Daandine Gas Processed at Kogan North Facility
Coal seam gas from the Daandine field was delivered to the power station from the Kogan North gas processing and compression facility adjacent to the field. Arrow Energy has a gas tolling agreement with APA Group, Australia's largest natural gas infrastructure company with gas pipelines transporting natural gas in every state and territory on mainland Australia. An agreement that provides for Arrow Energy Limited's full operation and ownership of the Daandine power station.


Daandine Coal bed Gas Field has Large Resource
The Daandine coal seam gas field has a probable gas reserve of 24 billion cubic feet of methane gas and 337 billion cubic feet of possible gas reserves, according to figures certified by independent consultants, Netherland, Sewell and Associates. Around 30 billion cubic feet of the gas will be supplied to the Daandine power station. The electricity generated is sold under a long term power purchase agreement with Essential Energy, the former energy retailer, Country Energy, owned by the New South Wales Government. The Daandine coal bed methane gas field was Arrow Energy Limited's third gas producing field, the other two at the time being Kogan North and Moranbah. Gas from the company fourth field Tipton West was the next field to come on line followed by Stratheden.


Arrow Energy Expanding Gas Exploration in Surat Basin
Arrow Energy are continuing to expand its Queensland Surat Basin operations by undertaking a major coal seam gas exploration, development and production program extending from Dalby to Wandoan and from Goondiwindi to Millmerran.


Daandine Coal Seam gas is Naturally Occurring
Coal seam gas (CSG) is naturally occurring gas that has become trapped in coal seams under the ground by ground and water pressure. It is most usually methane gas. The methane gas is found in open fractures between coal seams as well as inside the pores of the coal itself. Coal seams then become storage places for both water and gas with the water being under intense pressure from the weight of the rock sitting above it. This natural occurrence hold the gas in place but when the water pressure is reduced the gas is released. When a well is drilled down into the coal seam water pressure is reduced and water is slowly pumped from the coal seam, this process allows the gas to flow to the surface via the well that has been drilled.


Most Arrow Energy coal seam gas wells are less than 700 metres deep although they are drilled to a greater depth when necessary. When the well is drilled it becomes the only way the water and gas can reach the surface. The water is separated from the gas while still below the surface and transferred to a collection point where it is treated. The gas is piped to a processing facility where it is dried and compresed before being fed into pipelines for commercial distribution.

Arrow Energy

Arrow Energy develop gas fields, produce and sell Coal Seam Gas (CSG) and generate electricity.Developing since 2000 and supplying since 2004, Arrow delivers around 20% of Queensland's gas supply from five CSG fields located in the Bowen and Surat Basins.Arrow sells gas to a few companies including...........read more

ADDRESS

Arrow Energy
Level 39, 111 Eagle St
Brisbane, QLD 4000

GPO Box 5262
Brisbane, QLD 4001

OTHER INFO

Phone0730124000
fax0730124001

View Arrow Energy Page

We Currently have No Jobs Specified for

DAANDINE

Visit Jobs Section

No Information listed at this time ......

Following are the resources mined at Daandine

MiningLink teaser banner
Get a MiningLink profile Civil Link Banner
HME Technical Officer
Mechanical Trade Qualification.

Drilling Coordinator
HR WA Driver’s Licence.

Civil Engineer
A Civil Engineering degree or a Civil diploma.

Drill And Blast Superintendent
Significant background within a mining environment.

Housing Officer
Manual "C" Class drivers licence.

Disaster At Koolan For A Third Time
Disaster has struck again again at the worst possible time for Mount Gibson Iron. The high grade mine is now flooded to sea level after a section of its sea wall slumped on Tuesday, the third ....

Shipping Company Fined After Dumping Rubbish
The Australian Maritime Safety Authority has prosecuted Chinese company China Earth Shipping Incorporated, the owner of bulker Xin Tai Hai and the ship's master for discharging garbage last ....

Woodside Approves Persephone Project
Woodside has revealed it will push ahead with its billion dollar Persephone gas project off the Western Australian coast. Along with fellow stakeholders, which include global giants BP, Chevron, ....

Hairy Month For Mining
Growth has progressed across numerous mine sites, oil and gas rigs, and energy and mining companies this month after many individuals set themselves an important challenge, the 2014 Movember Mining ....

Chinese Mine Fire Kills 26
At least 24 people have been killed and dozens more injured following another accident at a Chinese mine. The current death toll for the incident stands at 24, although some are reporting the figure ....