Fluor Australia

Originally founded in 1912 and later coming to Australia in 1950 after World War II. Playing a major part in infrastructure projects such as building and maintenance of bridges, railways and harbours and constructed the Eildon Dam in Victoria.

Fluors timeline continued as follows:

  • 1956- Fluor entered into the natural resources sector and assisted clients in coal, iron ore, bauxite, copper, gold, nickel, cobalt, zinc, lead and silver mining.
  • 1960's- aiding in production of energy and chemicals and saw them carry out design, construction and maintenance projects of refineries, pipelines, power plants and chemical facilities
  • 1970's- Fluor completed construction of Goonyella Coal Mine, railway and port and commenced a series of oil and gas projects
  • 1980's- completed the Dampier to Perth pipeline
  • 1990's- contracted for Melbourne and Adelaide oil refineries and continued projects and successes through the year 2000
  • Today after 60 years in business Fluor continues to provide skilled labour hire, equipment and services to mining operations Australia wide, providing for major mining companies such as Rio Tinto and Santos.

    As part of a joint venture with SKM, has been involved in engineering, procurement, and construction management services for Iron Ore expansion projects in the Pilbara, WA, other contracts include, Gladstone Liquefied Natural Gas Project and providing track maintenance, construction, replacement and maintenance of track machines for Rio Tinto Iron Ore’s heavy haul railway in the Pilbara.

    Click here to claim this listing or remove Ads

    Level 6, 52 Merivale StBrisbane QLD 4104
    Phone: 07 3001 1500 Fax: 07 3001 1599
    fluor.com/australia

    GET IN TOUCH

    Please choose boot

    truck
    helmet
    spanner
    hammer
    boot
    Send Message

    We are waiting for images from Fluor Australia

    Fluor Australia is not advertising Plant for Hire



    If this is your company hire click here to update this page

    Y Fronts teaser banner MiningLink prefered resume writers Civil Link Banner
    HC Driverrake Hand
    HC Drivers with asphalting experience required for Temp - Perm opportunity. $27/hr + penalties, immediate start! Must be able to jump on the tools as required. Min 5 years experience in asphalting required.

    U/g Heavy Duty Fitter
    Temp to perm opportunity Great hourly rate Great camp facilities Various rosters available Due to continued growth, our client is looking at expanding their team of experienced Perth based Underground HD Fitter’s on various rosters. As an Undergound HD Fitter, your duties

    Otraco Tyre Technician Cadia
    Otraco currently have a position available at our Cadia project in the Orange region. We are looking for an experienced candidate to work an attractive 7/7 day/night roster.

    Underground Drillers Offsider
    Our client is an industry leader within Underground Mining and is seeking to expand their team of Underground Driller Offsiders on a 2:1 roster on various projects throughout WA. Underground Driller Offsiding is a labour intensive role in which you will be working closely alongside a Diamond Dr

    Shovel Operators Expressions Of Interest
    Downer Mining are currently seeking expression of interest from motivated and safety oriented Shovel Operators.

    Iron Ore Prices Drop
    Iron ore prices have dropped from a three year high on Wednesday leaving traders contemplating to pull down bids for physical cargoes in the spot market. The most-active iron ore on the Dalian ....

    Gladstone Aluminium Smelter To Cut Jobs
    Due to soaring Queensland power prices, Gladstone’s Boyne Island aluminium smelter is bound to cut jobs and off-hand $100 million worth of production. General manager of Boyne Smelters Joe Rea ....

    June 30 Deadline Set By BHP To Resolve Billion Dollar Claims
    On Thursday miner BHP Billiton, its partner Vale SA and their jointly owned Samarco unit announced a June 30 deadline that they have set to settle billions of dollars in compensation claims stemming ....

    $743 Million Rehab Bill For Hazelwood Owners
    The bill has been sent to the owners of the Hazelwood power station for rehabilitation of the mine, demolition of the plant and restoration of the surrounding area. The total estimated cost that ....

    Alcoa Aluminium Smelter To Stay Open
    A significant contribution from the Victoria state Government has helped keep the Alcoa aluminium smelter open. It was announced on Friday by Premier Daniel Andrews that a four year deal will keep ....

    iComplii